Roadmaps

A roadmap is a planning board for one initiative. It shows the work that will deliver the initiative, its milestones, and how pieces of work depend on each other.

Create a roadmap

  1. On the Roadmaps page, select New Roadmap.

  2. Define roadmap (step 1 of 2): enter a Name, choose the Scope (the initiative the roadmap belongs to) and check the Time horizon, which defaults to the initiative's own dates.

  3. Select Continue and complete step 2.
    ​

The roadmap board

The header shows the roadmap's name, its time horizon and owner, and Baselined on with a date once a baseline exists. The toolbar has:

  • Add to roadmap, Present, Share, History, Edit and More actions.

  • Timeframe, Layout, Milestones, Filter, Customize and Save view.

  • Work with Roadmapping Agent and Create baseline.
    ​

Choose a layout

Use Layout to switch between:

  • Kanban

  • Matrix


    ​

  • Gantt

  • Ranked List
    ​

  • Table
    ​

Roadmap items

  1. Create a new item

    Click on the + Add Item button and choose one of the item types:

    1. New roadmap item

    2. Programs
      ​


      ​

  2. Open an existing item

    A roadmap item is a single piece of planned work on a roadmap. Select an item on the board to open its details panel.
    ​


    The top of the panel shows the item's title and its main details. You can edit each field directly in the panel.

Field

Description

Status

Not Started, In Progress, On Hold or Completed

Confidence

How confident the team is in delivering the item: None, Low, Medium or High

Priority

None, P0 - Critical, P1 - High, P2 - Medium or P3 - Low.

Progress

The item's percentage complete.

Manual means progress is updated by hand; the panel shows when it was last updated. Progress can instead be updated from connected work items

Committed to

The period the item is committed to: a fiscal year (FY), a half (H1 or H2) or a quarter (Q1–Q4), or None.

Planned dates

The planned start and end dates

Owner

The person responsible for the item

Description

A description of the item

Key results

WorkBoard key results the item supports. Select Add, then search for key results and add them

If the planned end date has passed, the panel shows how long the item is overdue, for example 8 weeks overdue.

Comments tab

Discuss the item with your team. Type in Add a comment… and use @ to mention a colleague.


Work items tab

Connect the item to the work that delivers it:

  1. Select Add.

  2. Choose the source: Jira, Azure DevOps, Workstream or Program.

  3. Select the work to connect.

To have the item's progress follow the connected work, select Update progress automatically from connected work items. When this option is cleared, progress is updated manually.
​

Dependencies tab

Record how this item relates to other roadmap items.

  1. Select Add dependency;

  2. Choose the relationship:

    • has a dependency on

    • is a dependency for

    • is on critical path for

    • has a critical path dependency on

  3. Search for the roadmap item and select Add

Each dependency is listed with the related item's progress, status and date.
Use the ⋮ menu on a dependency to Edit dependency or Remove it.

Milestones tab

Track key checkpoints within the item:

  1. Select Add;

  2. Enter what the milestone aims to achieve;

  3. Set the Target date (required);

  4. Optionally, choose an Owner and a Status: None, Achieved or Missed.

  5. Select Add.

Details tab

Field

Description

Co-Owners

People who share ownership of the item with the owner.

Actual dates

The dates the work actually started and ended, tracked separately from the planned dates.

Tags

Your organization's labels. Select Add to tag the item.

More

The More menu contains two further tabs:

  • Files: attach supporting documents. Drag a file onto the panel or select to choose one. Files can be up to 50 MB: PDF, images, Office documents, MP4 or ZIP.

  • History: a record of every change to the item, showing who made it, what changed and when, for example "Jessica Smith changed Planned end date to 2026-07-31".
    ​

Create a baseline and track changes

A baseline is a snapshot of the roadmap as agreed.

  1. Open the roadmap and select Create baseline.

  2. The roadmap is then marked Baselined on the date and time you created it.

Select History to see Baselines (each snapshot, with the current one marked) and the Change ledger, which records each change to an item: the field, the old and new values, who made the change and when.
​

Share a roadmap and manage owners

Select Share to open Sharing & Permissions:

  • Co-owners: search for people and add them as co-owners. The dialog lists the roadmap's owners;

  • Shareable link: "Create a read-only link to send to whoever needs it — one person or a group. Anyone at your organization signed in to WorkBoard can open it; no edit, no drill-through."

    Select Get shareable link.
    ​